Electrical Installation Condition Reports · Buckinghamshire

Gerrards Cross EICR Inspections

A methodical EICR service for Gerrards Cross residents — booked in properly, tested on the day and certified before we leave site.

Gerrards Cross sits within easy reach of A40, A413 and M40 J1a via A413, and we're regularly working in and around Chalfont St Peter, Beaconsfield and Denham. That means we can usually get to a Gerrards Cross address within the same working week without asking a customer to hold a diary for a month. Our scope here is strictly domestic — houses, flats and small annexes.

BS 7671 Independent report Landlord-ready

Based at 14 Kelly Road, High Wycombe HP11 1BW. Domestic only.

What we look at during the inspection

  1. 1

    Book a slot

    Most EICRs take 3–4 hours for a typical family home. We'll agree a start time that lets us finish in one visit.

  2. 2

    Inspect and test

    We open the consumer unit, sample accessories on each circuit, and record insulation, continuity and RCD readings.

  3. 3

    Report

    You receive a signed EICR by email with a schedule of test results and any C1, C2 or FI observations explained in plain English.

Common EICR jobs we see in Gerrards Cross

  • a landlord meeting the five-year periodic requirement

  • an insurer asking for a current EICR after a claim

  • a home owner acting on a mortgage-lender request

  • an owner wanting a baseline before starting a rewire discussion

Kit & materials we use

  • calibrated Megger MFT-series testers
  • insulation, continuity and RCD test kit
  • voltage indicators and proving units
  • IR camera for spot checks on hot terminations

Scope note: An EICR is a report on condition. Remedial work is quoted separately so you can choose to spread it across visits if the budget matters.

Book a visit that suits your week

We hold Monday-to-Friday slots for Gerrards Cross customers each week. If your EICR isn't urgent, we can usually book something within the same week you enquire.

Questions we get asked most

How long does an EICR take?
3–4 hours for a typical 3-bedroom house. Larger properties and older installations take longer because of the sampling and note-taking.
How often should a home have one?
Owner-occupied homes: at least every 10 years or on change of occupancy. Rented homes: every 5 years.
What if you find C1 or C2 issues?
You'll get a full explanation, a written quote for remedials, and — for C1 — we make the fault safe on the day where practical.
Will the power be off?
Circuits are isolated one at a time as we test. Total power-off is usually only a few short windows.

Related pages you may want

Ready to book your Gerrards Cross EICR?

Send a quick message with your address and what's happening. If you're within 4 miles of Gerrards Cross we can normally book a visit within the same working week.

Free quote

Ready for a reliable, local electrician?

Get a friendly, no-obligation quote for your domestic electrical work. We cover Buckinghamshire, Oxfordshire and Surrey.